Classification | Content name | Remark |
Safety management personnel and equipment | Safety education and prevention | Production and non-production, outsiders |
Check personnel and equipment risks | ||
Personnel medical examination and insurance | ||
Production management | Test | |
Raw material mining and transportation | A mining permit is required. | |
Preparation of raw material | ||
Forming | ||
Cutting-stacking-transportation | ||
Kiln cart operation | ||
Drying, roasting | ||
Quality inspection | ||
Drawing out of kiln and get on transportation | ||
Finished product stacking | ||
People management | Personnel recruitment and training | |
Staff life | Production personnel | |
Salary and welfare | ||
Working arrangements | ||
Health environment and image | Health | Daily cleaning of production area, office area and living area |
Environmental image | Various publicity warning signs, landmarks, systems | |
Staff Image | Work clothes, hard hat, clean and tidy | |
Environmental protection | Desulfuration | Medicine, personnel, utilities |
Dust-removing | ||
Spray | ||
Spare parts procurement and management | Purchase | Spare parts, supplies, new tools, laboratory office equipment |
Store management | ||
Maintenance and upgrading of mechanical equipment | Engineering equipment | |
Raw material handling equipment | ||
Forming workshop | ||
Kiln equipment | ||
Kiln cart and operation equipment | ||
Kiln loading equipment | Semi-automatic binding machines, Brick holding machine | |
Environmental protection equipment | / | |
Special equipment | Robot body Air compressor | |
Basic cost | Fuel (coal) | / |
Water,electricity, oil | ||
Building and Foundation | Infrastructure and Maintenance | / |
The survey for starting an automatic clay brick project | |
In order to better service you, please read the following form carefully and fill in some of your answers, if you are not sure about some questoins, you can fill in as much asyou know. Please treat it seriously, because only you treat it carefully and seriously, can you get our professional support in shortest time | |
A: Your coordinates | |
@ | Name of company: |
@ | Company address |
@ | |
@ | Whatsapp ,or Weichat ID |
B: Essential condition for a brick project | |
@ | How much land do you have?. 1. Rectangular site provides length and width. 2. Irregularly shaped sites provide coordinate topographic maps |
@ | Location:Provide navigation address |
@ | Altitude: Fan air pressure, thermal design needs |
@ | Groundwater level: Construction needs |
@ | Electricity price:cost analysis |
Plan to start project construction time | |
C: General information | |
@ | Are you the final customer or an intermediate / adviser ? |
@ | Do you or your customer has experience in making bricks ? |
D: Technical information | |
@ | You want to produce stabilized soild bricks or hollow bricks? |
@ | please specify the size of the reference product. Size of bricks : L x W x H ( mm) |
@ | Production capacity : T/year or bricks/year or /day* |
E: Quality of clay | |
@ | Your clay is soft or hard… |
@ | Your clay contains stones, if yes, how much diamater mm roughly ? |
@ | Do you have any analyze report from your clay ? |
If the materials not yet produced bricks and without analysis, we highly suggest to do some analysis in local laboratory or send some raw materials to us for testing, The purpose & cost of analysis & testing : 1.The primary analysis(5kgs for each type of raw materials): find out the chemical composition of each materials for identify if the materials are good to produce bricks, (cost 800 USD) 2.Testing & trail production (20kgs for each type of raw materials): Trail production and make brick samples in our laboratory (with mini brick production line, mini dryer & mini kiln) can find out the best solution of mixing, drying temperature, drying cycle, firing curve and best firing temperature range etc... (cost 2200 USD) | |
The primary analysis is necessary and economic and for all the brick project to reduce investment risk and trail production are highly suggested, especially high investment brick project. | |
G: Working time | |
@ | 1 or 2 shifts of 8 hours for green brick production ? |
how many days/week ? | |
H: Ways of stackings | |
@ | Manul stacking |
@ | Automatic stacking(Robot stacking) |
@ | I: Type of kiln |
@ | Type of fuel |
@ | Gas,heavy oilor Solid fuel (wood, charcoal, coal, sawdust, coffee husks, cotton seeds, …) |
@ | Calorific value (kcal/kg) |
Fuel total sulfur content:Environmental requirements | |
Hoffman kiln, tunnel kiln, rotary kiln | |
Note: | The questioins with‘ @’ is important,please fill in and send back to us ,for other questions, if you are not sure at the moment, you can make study and inform us later.Please understand that only you treat the survey seriously, can you get one professional support and get successful auto clay brick plant |